![]() |
NAOJ |
Home Page for Site Survey |
Future Telescope Possibility |
![]() |
Access | |
since 2005/04/20 |
[Back to Tibet Site Survey Main Page] , [Back to Toshi's Page]
top | 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2004 | bottom | ||||||
Jun | May | Dec | Mar | Nov | Sep | Dec | Oct | Nov | Jul | Oct | May/June | March | TibetWS |
[back to TOP] |
![]() |
Date | contents | Stay |
June 19 (Wed) | Tokyo ->
Nangjing, with Liu Cai-Pin san
and Ji Yang san - new THz devices related to Dome A THz telescope, - high-energy orbital detector, and - 2.5m wide field telescope | Nangjing |
June 21 (Fri) | move to Kunming | Kunming |
June 22-24 | EACOA mid-sided telescope workshop at Kunming | Kunming |
June 25 (Tue) | excursion to Chengjiang Fossil Site and possibvly to Fusian Solar Observatory | Kunming |
June 26 (Wed) | Flight: Kunming-Chengdu-Lhasa | Lhasa |
June 27 (sat) | Lhasa: altitude acclimatization and trip preparation | Lhasa |
June 28 (Fri) | Flight: Lhasa-> Ali, site inspection and a session with local officials | Ali (Shiquanhe) |
June 29 (Sat) | Shiquanhe-Zanda by vehicle, topographic survey along the way, and visit Guge Dynasty and Tholing Kloster | Zhanda |
June 30 (Sun) | Zanda-holy mountain and sacred lake (Kangrinboqe or Sumeru or Kailash, Mapam Yumco) to Shiquanhe by vehicle | Ali (Shiquanhe) |
July 01 (Mon) | Flight: Ali-> Lhasa, an interview with Tibet officials | Lhasa |
July 02 (Tue) | Flexible time for rest and city visit | Lhasa |
July 03 (Wed) | Lhasa-Chengdu-Beijing | Beijing |
July 04 (Thu) | Beijing: inspection summary and cooperation discussion | Beijing |
July 05 (Fri) | Flight: Beijing to Tokyo | --- |
[back to TOP] |
![]() |
|
Ali_TwoGoodPeaks_ClearSkyMap.jpg ![]() |
20130603_Ali_Peak2_marked.jpg ![]() |
( see more details in PPT file (7.8MB) ) |
Date | contents | Stay |
May 27 (Mon) | Tokyo ->
Beijing,
meet Liu san at the airport go to Bank to withdraw travel fee | Beijing |
May 28 (Tue) | fly to Lhasa | Lhasa |
May 29 (Wed) | fly to Ali , Liu san drove ... :-P | Ali |
May 30 (Thu) | Summit work at Gar
| Ali |
May 31 (Fri) |
Summit work at Gar
| Ali |
June 01 (Sat) |
Summit work at Gar
| Ali |
June 02 (Sun) |
| Ali |
June 03 (Mon) | visit other peaks near Ali (Sasaki Peak#1 and #2) | Ali |
June 04 (Tue) | get Air ticket for us | Ali |
June 05 (Wed) | fly to Lhasa | Lhasa |
June 06 (Thu) | Lhasa-Chengdu(Seito)-Beijing | Beijing |
June 07 (Fri) |
Flight: Beijing ->
Haneda delayed flight due to sudden lightning ==> enjoy the last chinese foods at Airport Restaurant | - |
[back to TOP] |
![]() |
2012-12-06 | Narita->Beijing (JL863) Wang san welcome me at the airport to Hotel (Best Western H.). |
2012-12-07 | Chine Bank w/ Wang san. Liu san arraived NAOC from France, dinner w/ Liu, Wang, Zenno, Sasaki, and Yao-san a little bit later |
2012-12-08 | Beijing->Lhasa (CA4125) |
2012-12-09 | Lhasa->Ali (TV9807), stay expensive Hotel near Indus river |
2012-12-10 | change Hotel to lower
price. Accidentally dropped
my notePC, resulted with several dirt/black spots on LCD
display! went to the summit. No dome on 10m tower. M2 spiders on CloudMon were hardly distorted, repaired fairly by hand. WeatherStation is OK. Bring back RAID to the town, then backed up the data to another disk. |
2012-12-11 | buy battery and alcohol at Ali's
supermarket. talked w/ Yao san how to set up CT2 sensors, he
said NAOC can buy PC and CT2 cables from Kaneko Co. Joe san requested Jars from Japan. examine GPS receiver outside SCIDAR dome. |
2012-12-12 | check UPS, but it's not working. directly connect to 220V supply for PC and instruments. |
2012-12-13 | Yao san is now proposing 5yr Project
for 2m telescope. CT2 support stay can be made by NAOC under
design drawings provided by NAOJ. Kurita san (Kyoto U.) can
be invited to Tel WS at Kunming in April/May ( now fixed in
late June, 2013). Yao san said they want to make 3.8m
telescope under cooperation w/ Kyoto U. check UPS finally that UPS is NOT working. After reconnection, PC doesn't work to be changed to new PC (NEXCOM NICE3500). |
2012-12-14 | After wait for so long time in hotel,
then went to summit and feel so strong wind at the summit. CloudMon working OK, Temperature Monitors(COM8, COM9) working OK, but Dust Counter NG. WeatherMonitor COM is NOT correctly communicated to install the new driver soft for USB-Ser2 (D:/Drivers/1IO/USB_RS232C_Sabrent), then COM11 OK. installed drivers for Keithley DMM for CT2 controller (T:\Drivers\0MeasureInstruments\Keithley Instruments\20110603DriverDownLoad\_1_KIOL-850C04.exe, _2_2700-852C02.exe). CloudMon unstable to get images, so reconnect FireWire cable, then OK hopefully. CM image show some material on M2 spider to be checked tomorrow. |
2012-12-15 |
CloudMon should be installed rubber material inside to
protect the Camera against low temperature.
Heaters are necessary inside CloudMon to warm the
camera, DustCounter and Plastic Control? (planned to install
next visit). remove some cloth material, accidentally attached CloudMon M2 by strong wind, by hand. GSP measurement on 10m tower. Clean up CloudMon M1 and M2 w/ Alcohol, but some dirty patches remain on the mirror surfaces. clean up middle 2F floor after stealing some tools during these winter/spring. Start AC power monitor. CloudMon cannot get any images. After kill and reboot, CloudMon works. ProcessMonitor (soft) is set up without no periodic rebooting as some routines remain. |
2012-12-16 | Ali->Lhasa (TV9808). Joe-san's birthday party at Lahsa. |
2012-12-17 | (Lhasa) walking around Potala palace |
2012-12-18 |
Lhasa->Chengdu(TV9801/CA3981)
->Beijing(CA1432) stay in BestWestern H. |
2012-12-19 | (NAOC) lunch w/ Zenno san. Liu san
explain his SCIDAR paper. pay for domestic flights and hotel fee in Tibet (12,440 yuan CNY) |
2012-12-20 | Zennno-san accompanied me to Beijing airport. Beijing->Narita(JL864) |
[back to TOP] |
Sasaki's Photos |
![]() |
![]() (click to enlarge) |
![]() (click to enlarge) |
![]() (click to enlarge) |
![]() |
![]() |
ChugokuShinbun (pdf format). | ShinanoMainichi (pdf format) |
[back to TOP] |
Sasaki's Photos |
![]() |
2011-11-01(Tue) | Haneda->Beijing(CA182) |
2011-11-02(Wed) | Beijing->Chengdu->Lhasa(CA4112) |
2011-11-03(Thu) | Due to Snow, no flight available. Stay in Lhasa. |
2011-11-04(Fri) | Lhasa->Ali (TV3031) |
2011-11-05(Sat) | buy chairs at Supermarket. Gar summit works. CloudMon NOT working->reconnect F/W cable. |
2011-11-06(Sun) | buy electric lamps at Supermarket. Gar summit works. renew control software. set up RATOC RAID1. setup Weather Station Vaisala WXT510 at 2F inside 10m dome. |
2011-11-07(Mon) | Gar summit works. settle WeatherStation WXT510 on the roof. |
2011-11-08(Tue) | Gar summit works. adjust Calib Block on CloudMon. set up ULTRAVNC. adjust DustCouonter for its negative measure values. |
2011-11-09(Wed) | Gar summit works. Zero adjust on DustCounter, then work well w/ positive measure. |
2011-11-10(Thu) | Ali->Lhasa (TV9808) |
2011-11-11(Fri) | Lhasa->Chengdu->Beijing (CA4111) |
2011-11-12(Sat) | Beijing->Haneda (CA181) |
[back to TOP] |
Sasakis Photos |
![]() |
2011-09-05(Mon) | Narita->Beijing |
2011-09-06(Tue) | Ohshima, Nagayama arrived |
2011-09-07(Wed) | Yoshida arrived |
2011-09-08(Thu) | Beijing->Lhasa |
2011-09-09(Fri) | |
2011-09-10(Sat) | Lhasa->Saga by 4WD |
2011-09-11(Sun) | Saga->Shiquanhe by 4WD |
2011-09-12(Mon) | works at Gar
connect K2701 using Ethernet to confirm its function setup ACPowerLogger. |
2011-09-13(Tue) | shopping at Ali works at Gar
bring up BlackBox for our instruments assemble CloudMon system setup DELL C521 with 2.5inch HDD (500GB) HP note PC is unstable -> bring back to Japan setup UPS lack of signal/power cables for Weather Station and Bird nest |
2011-09-14(Wed) | shopping at Ali works at Gar
|
2011-09-15(Thu) | shopping at Ali works at Gar
|
2011-09-16(Fri) | Shiquanhe->Shigaze by 4WD |
2011-09-17(Sat) | Shigaze->Lhasa by 4WD |
2011-09-18(Sun) | |
2011-09-19(Mon) | Lhasa->Chengdu->Beijing |
2011-09-20(Tue) | After withdraw at Bank, pay the travel fee at NAOC |
2011-09-21(Wed) | Beijing->(Narita)->Fukuoka, due to Taihoon attack |
2011-09-22(Thu) | Fukuoka->Narita |
[back to TOP] |
Sasaki's Photos |
![]() |
Ohshima's Photos (only Thumbnail image) |
![]() |
[back to TOP] |
![]() |
2009Oct19 | Narita -> Beijing | |||||||||||||||||||||||||||||||||||||||
2009-10-20(Tue) | Beijing -> Lhasa (visit Lhasa 4 times) Medical Doctor Sue, Driver John Cho, Mr. Joshua of Taiwan, Dr. Liao Chia-Hsien | |||||||||||||||||||||||||||||||||||||||
2009-10-21(Wed) | Stay at Lhasa
2009-10-22(Thu) |
Depart from Lhsa at 13:45 to
Sunghu? at 21:55,
Prof.Yao's birthday | 2009-10-23(Fri) |
Sunghu -> Saga -> Ali (4200m) | 2009-10-24(Sat) |
clear, discuss about work
items at Oma,
examin Ali south site in the afternoon, | dinner with the director of Seismological Institute physical examination by MD. Sue, Mr. Mikami try his nose tape for his health 2009-10-25(Sun) |
crimb Ali south site (5100m high) | dinner with local governor, Mr.Tawa 2009-10-26(Mon) |
Shiquanhe(獅泉河) -> Enko (塩湖) -> Oma -> Enko (塩湖) (Cottage) | Our Instruments working at Oma ! minor trouble on writing data on to Lacie HDD -> possibly no data availabel on Oct. Mr. Liu, Mr. Li Lin stay at the mountain for Seeing Monitor 2009-10-27(Tue) |
work at Oma, change CT2
sensors and extend Cable #4,
stay at Enko(Cottage) | cleay, but a slight cloud in lower west at Enko (塩湖) 2009-10-28(Wed) |
Clear, work at Oma, | stay at cottage at XXX during going back to Lhasa Stored material at Oma |
2009-10-29(Thu) |
XXX -> Hot spring site |
2009-10-30(Fri) |
Rikaze -> Lhasa | 2009-10-31(Sat) |
partly cloudy, Temp Qo-kang(大昭寺、トゥルナン寺=ジョカン寺),, | modern restraunt with local governors, secretary 2009-11-01(Sun) |
clear, go to Airport, delayed due to snow | 2009-11-02(Mon) |
clear, cloud in south. wait for air plane. | consider Logo Title as
stay at Golden Hotel at Beijing 2009-11-03(Tue) |
clear, Visit at Prof.Yao/NAOC,
| stay in Beijing 2009-11-04(Wed) |
clear, check data of | CloudMon/CT2 sensors at NAOC, stay in Beijing 2009-11-05(Thu) |
clear, depart NAOC to Decheng 徳州, | stay at Hengshui 衝水 2009-11-06(Fri) |
lake Hengshui(衝水湖), Hengshui 衝水 ->
stay Decheng 徳州, enjoy KaraOke | 2009-11-07(Sat) |
Park Circus, Iron-work Facotry, | Medicare Factory(Oxygen supply) , back to Beijing under deep fog 2009-11-08(Sun) |
Summer Palace Yiheyuan(頤和園), | visit Prof.Yao at NAOC (get Site data around Ali) 2009-11-09(Mon) |
write a draft of work report, | snowing, Beijing->Narita, Night-time Taxi fair(+\800) |
[back to TOP] |
![]() |
2008Nov11 | Narita -> Beijing |
2008Nov12-13 | Beijing -> Chengdu(成都,四川省)-> Lhasa |
2008Nov14-16 | Lhasa -> Saga -> Ali -> Enko |
2008Nov17-19 | Works at Oma site (5000m) |
2008Nov20-21 | Gerze->Shigaze->Lhasa |
2008Nov22-24 | Lhasa->(Tibet train (西蔵鉄道, 夜行寝台))->Lanzhou 蘭州(甘粛省)->Urumqi->Kashi |
2008Nov25-26 | Kashi -> Works at Karasu site (4500m) -> Taxkorgan(Tashkurghan, 塔什庫爾干) |
2008Nov27-28 | Kashi, bank, shopping, sightseeing at 香妃墓 |
2008Nov29 | Kashi -> Urumqi-> Beijing |
2008Nov30 | Beijing -> Narita -> Honolulu -> Hilo |
[back to TOP] |
![]() |
![]() |
![]() |
At the Site 2008-07-25 |
Crashed car Next day |
[back to TOP] |
[back to TOP] |
![]() Trip Highlights ( ppt file: 375 MB ) |
![]() Cloud at Karasu on 2007-03-18 ( gif: 65.5 MB ) |
![]() Cloud at Karasu (visible image) on 2007-03-18 |
[back to TOP] |
top | 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2004 | bottom | ||||||
Jun | May | Dec | Nov | Sep | Dec | Oct | Nov | Jul | Oct | May/June | March | TibetWS |
[Back to Tibet Site Survey Main Page] , [Back to Toshi's Page]